0.8 History & Undo

cmBuilder auto-saves your work for you. This guide shows how to keep track of changes made to your Site Plan and revert changes using undo/redo functionality.

Summary

  • View and select to revert to previous states using the history logĀ 
  • Undo and Redo functionality is accessed from the top tool bar or by mouse right-click
  • Undo/Redo is currently limited to resource movements, drawing overlay, detailed massing, and hiding/showing building model elements

History Log

  • From the 3 dot menu at the top of the page, select History Log .
  • From the dropdown history list, select desired action.

04.png

01.png

  • Click Restore This State to accept changes and revert to selected state.

02.png


Using Undo and Redo:

  • Right click on selected resource, building model or empty space
  • Select undo/redo to make desired changes
    • Note: The undo feature is limited to 10 previous states and the button will disable upon reaching this limit
03.png

FAQ:

Do I need to save my work in cmBuilder?

No, cmBuilder saves your work for you automatically. You can track your work and save states using the History Log.

Was this article helpful?
0 out of 0 found this helpful

Comments

0 comments

Please sign in to leave a comment.

Articles in this section

See more